Skip to main content Scroll Top

Underground Parking Traffic Coating Installation

Clients:

Melrose Park Investments Ltd

Location:

605 Finch Ave West ,North York

Completed:

2025

What we did?

 Surface preparation

We cleaned and prepared the concrete surface by removing dust, oils, and loose particles. Any cracks or defects were repaired to ensure proper adhesion of the coating.

--

Primer application

A suitable primer was applied to the prepared concrete to improve bonding between the substrate and the traffic coating system. The primer was allowed to cure as per manufacturer specifications.

Traffic coating application

The traffic coating system was applied in multiple layers to achieve a durable, skid-resistant finish. The surface was allowed to cure before opening to vehicular traffic.

Live Images
From the site